Projects

Hotel Inmood Aucanada

Hotel Inmood Aucanada

Talat delivered the full technical renovation of the 70 rooms at Hotel President in Port d’Alcúdia, with a 5‑month execution period. The project transformed the hotel’s core systems with tailored solutions for climate control, safety, energy, plumbing and connectivity, placing equal emphasis on guest comfort, operational reliability and long‑term sustainability.
Read more    →
Hotel Fergus Club Palmanova

Hotel Fergus Club Palmanova

Talat designed and executed a private underground car park with 59 spaces for Hotel Fergus Club Palmanova, built with fire‑resistant reinforced concrete, high‑performance electrical and safety systems in line with the Spanish Building Code, and an advanced ventilation and smoke extraction strategy. The facility is fully integrated with the hotel’s technical rooms, enhancing user comfort, regulatory compliance and operational efficiency.
Read more    →
Vua Can Sedal

Vua Can Sedal

In this project designed by Estudio Cano, the hydraulic design incorporates regulation, balancing, measurement, and control systems, optimizing energy consumption, reducing losses, and improving the overall performance of the facility.
Read more    →
Hotel Cappuccino Cort

Hotel Cappuccino Cort

Talat has contributed to the repositioning of Hotel Cappuccino Cort, a 32‑room “Urban Hotel” on Plaza de Cort, by upgrading the electrical, telecommunications, home automation and control systems across rooms and public areas. The project enhances guest comfort and operational control through smarter, more efficient and fully connected installations.
Read more    →
Apartahotel Es Pujols Formentera

Apartahotel Es Pujols Formentera

Construction project focused on the reduction of carbon dioxide emissions, with a strong emphasis on energy efficiency throughout the design, construction, and operational life cycle of the development. The approach prioritizes the rational use of resources, favoring locally sourced materials and the optimization of energy consumption.
Read more    →
Motorworld

Motorworld

We delivered the climate, hot water, sanitary, and electrical systems for a 12,000 m² complex, including the redesigned machine room. Our Engineering and BIM teams optimized the installations. KNX devices were integrated using Schneider Electric’s EcoStruxure platform for advanced control.
Read more    →
Hipotels Playa de Palma

Hipotels Playa de Palma

Engineering project and management of the hotel’s full building systems. Implementation of energy-efficient installations across the property. A comprehensive intervention ensuring reliable and sustainable operation.
Read more    →