Projects
Santiago Bernabéu Stadium Hypogeum
HVAC system for air conditioning
& BMS control in the hypogeum
of the Santiago Bernabéu stadium
Read more →
& BMS control in the hypogeum
of the Santiago Bernabéu stadium
Rafa Nadal Academy
Comprehensive project management, engineering, and BMS integration for the Rafa Nadal Tennis Center.
Read more →
SABINA ESTATES IBIZA – Residential Complex
An advanced integration project for energy and water systems in 11 villas at Sabina Estates Ibiza, combining geothermal energy, energy recovery, water reuse and centralized control to achieve BREEAM® Excellent sustainability standards.
Read more →
Hotel RIU Palace Nautilus,
Comprehensive refurbishment project focused on upgrading the hotel’s category, with a full renewal of building services and a significant improvement in energy performance.
Read more →
Hotel Inmood Aucanada
Talat delivered the full technical renovation of the 70 rooms at Hotel President in Port d’Alcúdia, with a 5‑month execution period. The project transformed the hotel’s core systems with tailored solutions for climate control, safety, energy, plumbing and connectivity, placing equal emphasis on guest comfort, operational reliability and long‑term sustainability.
Read more →
Hotel Fergus Club Palmanova
Talat designed and executed a private underground car park with 59 spaces for Hotel Fergus Club Palmanova, built with fire‑resistant reinforced concrete, high‑performance electrical and safety systems in line with the Spanish Building Code, and an advanced ventilation and smoke extraction strategy. The facility is fully integrated with the hotel’s technical rooms, enhancing user comfort, regulatory compliance and operational efficiency.
Read more →
Padel Bendinat
Technical outdoor infrastructure for a sports facility integrating energy, water, connectivity and centralized control systems.
Read more →
Vua Can Sedal
In this project designed by Estudio Cano, the hydraulic design incorporates regulation, balancing, measurement, and control systems, optimizing energy consumption, reducing losses, and improving the overall performance of the facility.
Read more →
Ses Fonts viviendas
Development of a high-efficiency integrated solution for the Ses Fonts residences, based on the combination of energy and climate systems designed to enhance comfort, sustainability and consumption optimization.
Read more →
Hotel Cappuccino Cort
Talat has contributed to the repositioning of Hotel Cappuccino Cort, a 32‑room “Urban Hotel” on Plaza de Cort, by upgrading the electrical, telecommunications, home automation and control systems across rooms and public areas. The project enhances guest comfort and operational control through smarter, more efficient and fully connected installations.
Read more →
Hotel Spa Son Net
Development of the executive design, site supervision and MEP and pool design for the refurbishment and expansion of Hotel Spa Son Net in Puigpunyent. The intervention was driven by a clear technical upgrade of the complex, with a strong focus on energy performance, sustainability and an enhanced guest experience.
Read more →
Promoción Can Apolonia
Development of a townhouse promotion in Son Carrió, delivered by the Contract team through a fully integrated management approach covering the project from initial coordination to complete construction, with a strong focus on quality and control at every stage.
Read more →
Villas Malgrats
Delivery of the complete technical installations for two high-end detached villas in Malgrats, Santa Ponça (Calvià), with premium-grade solutions, top-quality materials and a strong focus on comfort, energy efficiency and technology integration.
Read more →
Bendinat, 40
Comprehensive technical installation for a beautiful villa in Bendinat, Mallorca, including electrical systems, telecoms, security and home automation for full property control.
Read more →
50 villas son Parc
Comprehensive development of a 50-home residential promotion in Son Parc, Menorca, with coordinated delivery of urbanization, building works and technical services, aimed at creating a high-quality residential complex that is functional and seamlessly integrated into its surroundings.
Read more →
Hotels Kempinski Grace Bay
End-to-end MEP redesign, BIM modeling, and systems integration for the Hotel Kempinski Grace Bay resorts.
Read more →
Barbados Sandals Beaches Resorts
Executive project development for two large hotels in the Caribbean, one in Jamaica and one in Barbados.
Read more →
Apartahotel Es Pujols Formentera
Construction project focused on the reduction of carbon dioxide emissions, with a strong emphasis on energy efficiency throughout the design, construction, and operational life cycle of the development. The approach prioritizes the rational use of resources, favoring locally sourced materials and the optimization of energy consumption.
Read more →
Hipotels Don Juan Cala Millor
A comprehensive renovation coordinated by Talat, focused on upgrading all key installations to improve technical efficiency and enhance the end-user experience.
Read more →
Lobster Club Puerto Portals
Technical and functional fit-out of Lobster Club, an exclusive sea club located at Edificio Panorama in Puerto Portals, conceived as a landmark venue for Mediterranean dining, seaside leisure and high-end hospitality. The intervention focused on the implementation and adaptation of the required MEP services for its new use, ensuring comfort, operability and seamless integration with the building’s architecture.
Read more →
Motorworld
We delivered the climate, hot water, sanitary, and electrical systems for a 12,000 m² complex, including the redesigned machine room. Our Engineering and BIM teams optimized the installations. KNX devices were integrated using Schneider Electric’s EcoStruxure platform for advanced control.
Read more →
Bikini Island & Mountain Hotel Es Trenc
Full transformation of the former hotel into the new Hotel Bikini Island Strenc. Completed a 360º renovation to meet the demanding deadline for June 2024 season opening.
Read more →
Gran Hotel Mas d’en Bruno Priorat
Delivering of the full MEP scope, including HVAC, electrical, hydrosanitary, and fire-protection systems, along with advanced automation solutions to optimize energy use and elevate the guest experience.
Read more →
Hotel Melià Villa Le Blanc
High-efficiency energy efficiency systems and minimal water consumption installations.
Read more →
Hipotels Playa de Palma
Engineering project and management of the hotel’s full building systems. Implementation of energy-efficient installations across the property. A comprehensive intervention ensuring reliable and sustainable operation.
Read more →
Son Moix Stadium RCD Mallorca
Construction of the current grandstand and cantilever. Electrical and telecommunications infrastructure, as well as telecommunications nodes and lighting for the Sol grandstand.
Read more →
Iberostar Bahía de Palma
Project Management for this hotel, which boasts the first cantilevered swimming pool in the Balearic Islands.
Read more →
Hotel Iberostar Alcudia Park
Project for the comprehensive activity and facilities of the Alcudia Park Hotel, consisting of five separate buildings joined together at ground level.
Read more →