Projects

Hotel Inmood Aucanada

Hotel Inmood Aucanada

Talat delivered the full technical renovation of the 70 rooms at Hotel President in Port d’Alcúdia, with a 5‑month execution period. The project transformed the hotel’s core systems with tailored solutions for climate control, safety, energy, plumbing and connectivity, placing equal emphasis on guest comfort, operational reliability and long‑term sustainability.
Read more    →
Hotel Fergus Club Palmanova

Hotel Fergus Club Palmanova

Talat designed and executed a private underground car park with 59 spaces for Hotel Fergus Club Palmanova, built with fire‑resistant reinforced concrete, high‑performance electrical and safety systems in line with the Spanish Building Code, and an advanced ventilation and smoke extraction strategy. The facility is fully integrated with the hotel’s technical rooms, enhancing user comfort, regulatory compliance and operational efficiency.
Read more    →
Vua Can Sedal

Vua Can Sedal

In this project designed by Estudio Cano, the hydraulic design incorporates regulation, balancing, measurement, and control systems, optimizing energy consumption, reducing losses, and improving the overall performance of the facility.
Read more    →
Ses Fonts viviendas

Ses Fonts viviendas

Development of a high-efficiency integrated solution for the Ses Fonts residences, based on the combination of energy and climate systems designed to enhance comfort, sustainability and consumption optimization.
Read more    →
Hotel Cappuccino Cort

Hotel Cappuccino Cort

Talat has contributed to the repositioning of Hotel Cappuccino Cort, a 32‑room “Urban Hotel” on Plaza de Cort, by upgrading the electrical, telecommunications, home automation and control systems across rooms and public areas. The project enhances guest comfort and operational control through smarter, more efficient and fully connected installations.
Read more    →
Hotel Spa Son Net

Hotel Spa Son Net

Development of the executive design, site supervision and MEP and pool design for the refurbishment and expansion of Hotel Spa Son Net in Puigpunyent. The intervention was driven by a clear technical upgrade of the complex, with a strong focus on energy performance, sustainability and an enhanced guest experience.
Read more    →
Promoción Can Apolonia

Promoción Can Apolonia

Development of a townhouse promotion in Son Carrió, delivered by the Contract team through a fully integrated management approach covering the project from initial coordination to complete construction, with a strong focus on quality and control at every stage.
Read more    →
Villas Malgrats

Villas Malgrats

Delivery of the complete technical installations for two high-end detached villas in Malgrats, Santa Ponça (Calvià), with premium-grade solutions, top-quality materials and a strong focus on comfort, energy efficiency and technology integration.
Read more    →
Bendinat, 40

Bendinat, 40

Comprehensive technical installation for a beautiful villa in Bendinat, Mallorca, including electrical systems, telecoms, security and home automation for full property control.
Read more    →
50 villas son Parc

50 villas son Parc

Comprehensive development of a 50-home residential promotion in Son Parc, Menorca, with coordinated delivery of urbanization, building works and technical services, aimed at creating a high-quality residential complex that is functional and seamlessly integrated into its surroundings.
Read more    →
Apartahotel Es Pujols Formentera

Apartahotel Es Pujols Formentera

Construction project focused on the reduction of carbon dioxide emissions, with a strong emphasis on energy efficiency throughout the design, construction, and operational life cycle of the development. The approach prioritizes the rational use of resources, favoring locally sourced materials and the optimization of energy consumption.
Read more    →
Lobster Club Puerto Portals

Lobster Club Puerto Portals

Technical and functional fit-out of Lobster Club, an exclusive sea club located at Edificio Panorama in Puerto Portals, conceived as a landmark venue for Mediterranean dining, seaside leisure and high-end hospitality. The intervention focused on the implementation and adaptation of the required MEP services for its new use, ensuring comfort, operability and seamless integration with the building’s architecture.
Read more    →
Motorworld

Motorworld

We delivered the climate, hot water, sanitary, and electrical systems for a 12,000 m² complex, including the redesigned machine room. Our Engineering and BIM teams optimized the installations. KNX devices were integrated using Schneider Electric’s EcoStruxure platform for advanced control.
Read more    →
Hipotels Playa de Palma

Hipotels Playa de Palma

Engineering project and management of the hotel’s full building systems. Implementation of energy-efficient installations across the property. A comprehensive intervention ensuring reliable and sustainable operation.
Read more    →